Electrical Planning Reports

Electrical Planning Report assessment for BC strata

WHAT WE OFFER

At Ingenious Electric Ltd., we help strata corporations and property managers meet evolving electrical requirements through comprehensive Electrical Planning Reports (EPRs) and EV-Ready Plans.

The EPR is mandatory under the Strata Property Amendment Act 2023 (Bill 22) for all stratas with five or more lots, ensuring that buildings are equipped to manage current and future electrical demands. It must be completed by December 2026 or 2028 dependent on your zone and location.

Smart. Safe. Reliable.

We provide professional, code-compliant residential electrical solutions designed to enhance safety, efficiency, and future readiness. Whether upgrading existing systems or planning new installations, Ingenious Electric Ltd. ensures every project aligns with BC Hydro and Canadian Electrical Code standards.

01. Electrical Planning Reports (EPR)

EPR3

Plan today, power tomorrow

Plan for EV chargers, heat pumps, and future demand all within BC Bill 22 compliance

02. EV-Ready Planning Report

Residential1

Charge into the future

EV-Ready Plans with load analysis, layout, and rebate-ready documentation to simplify approvals.

03. Electrical Capacity Assessment

EPR7

Know your home’s limits safely

We assess your electrical system capacity to prevent overloads and costly upgrades.

04. Full Design & BC Hydro Coordination

EPR8

From report to reality.

We convert EPR findings into stamped drawings and handle BC Hydro submissions end-to-end.

Electrical Planning Reports

At Ingenious Electric Ltd., we provide end-to-end Electrical Planning Report (EPR) solutions designed to simplify compliance and empower strata corporations across British Columbia. Our team manages every stage of the process from initial assessment and data collection to report preparation, detailed electrical design drawings, and BC Hydro application coordination delivering a complete, seamless service under one roof.

We go beyond meeting regulatory requirements. Our engineers focus on practical, future-ready solutions that help strata corporations understand their electrical infrastructure, plan for upgrades, and accommodate growing demands such as electric vehicle (EV) charging.

What an Electrical Planning Report Includes

In full compliance with the Strata Property Amendment Act, 2023 (Regulation 5.11), our EPRs provide:

  • A detailed evaluation of the current electrical system capacity
  • Analysis of current and peak demand levels
  • Assessment of existing and future anticipated electrical loads (including EV charging)
  • Professional recommendations for managing demand and increasing capacity efficiently

Each report is prepared by qualified professional engineers and certified technologists, ensuring accuracy, reliability, and adherence to all Strata Property Act standards and provincial regulations.

Compliance Requirements and Applicability

The Electrical Planning Report requirement applies to all regions of British Columbia, including rural communities, and covers every type of strata corporation, such as:

  • High-rise apartment buildings
  • Townhouse complexes
  • Bare land strata
  • Industrial and commercial strata properties
  • Leasehold strata
  • Recreational strata corporations

EPRs are a one-time assessment that must:

  • Be maintained as part of the strata corporation’s official records
  • Be attached to the Form B Information Certificate, similar to a Depreciation Report
  • Cannot be waived or exempted by a ¾ vote

EV Ready Plan

As electric vehicles become more common, buildings across BC must be prepared for charging infrastructure. An EV-Ready Plan ensures your property can support current and future EV charging needs.

At Ingenious Electric Ltd., we simplify the process. Our engineers assess your building’s electrical capacity, recommend upgrades, and design safe, efficient layouts for parking areas.

With new BC regulations and growing demand, now is the time to prepare. Our team can guide you for rebates from BC Hydro and FortisBC that cover up to 75% of an EV-Ready Plan (up to $3,000).

Additional Services

Ingenious Electric Ltd. has the capability and expertise to go beyond compliance . We offer step-by-step approach for system upgrades and even BC Hydro application permit applications, providing a complete solution under one roof.

Full Design & BC Hydro Coordination

At Ingenious Electric Ltd., we help strata corporations, property managers, and homeowners take full advantage of BC Hydro’s EV-charger and energy-efficiency rebate programs.
Our engineers guide you through the entire process from eligibility review and technical documentation to application submission and final verification ensuring your project meets all utility and municipal requirements.
With our support, you can maximize available incentives and reduce project costs while upgrading to safer, smarter, and more sustainable electrical systems.

Connect with us for a tailored proposal and transparent pricing on your EPR, EV-Ready Plan, or Power Design Application